Your current location:
Homepage
>
>
In 2017

In 2017

  • Categories:history
  • Author:
  • Origin:
  • Time of issue:2017-08-20
  • Views:0

(Summary description)Pucheng plant broke ground with a designed capacity 500 tons.<br />
Obtained OHSAS18001.

In 2017

(Summary description)Pucheng plant broke ground with a designed capacity 500 tons.<br />
Obtained OHSAS18001.

  • Categories:history
  • Author:
  • Origin:
  • Time of issue:2017-08-20
  • Views:0
Information
Pucheng plant broke ground with a designed capacity 500 tons.
Obtained OHSAS18001.

Scan the QR code to read on your phone

Previous: In 2018
Next: In 2015
Previous: In 2018
Next: In 2015
Search
 莱特光电

China's well-known developer and manufacturer of OLED materials

and intermediates as well as Pharmaceutical intermediates.

 

 

Shaanxi Lighte Photoelectric Materials Co., Ltd      陕ICP备18014376号     Powered by www.300.cn       陕公网安备 61019002001290号

 莱特光电